Renovation measures Residenztheater: renovation, monument protection, reconstruction of a theater building in Munich
- Client:
- Bauamt München 1 (Building Authority Munich 1)
- Contact person:
- Mr. Roland Geis Dipl.-Ing.
- By order of the Staatlichen Bauamtes München 1 (State Building Authority Munich 1), additional surveying work was conducted by HOFFMANNARCHITEKT at the Residenztheater in Munich to achieve two additional sectional drawings through the building. At the same time, existing planning documents were assessed for their dimensional consistency. In addition, we are commissioned to conduct the execution planning, tender and construction management of the renovation measures.
- Construction period:
- August to September 2010
- Overall cost, cost type 1-7 gross:
- €80,000
- Work stages:
- 5 to 8
- Execution planning, tender and contract award, site supervision:
- HOFFMANNARCHITEKT
- Collaborators:
- Gregor Ziernik Dipl.-Ing.(FH) Architektur
- Structural planning:
- Planungsgruppe Brachmann, Munich
- Tags:
architect, architectural office, architect Munich, architectural office Munich, monument protection, renovation, reconstruction, new building, appraisal, surveying, on-site measurement, execution planning, tender, assistance in contract award, site supervision, State Building Authority Munich 1, Residenztheater Munich, theater building, special construction, Rainer Hoffmann, Munich, HOFFMANNARCHITEKT